NEC4: Engineering and Construction Subcontract

SKU: 1481813
Stock Status: In Stock (Only 1 left)
Description
The NEC4: Engineering and Construction Subcontract (ECS) is intended for use in appointing a subcontractor where the contractor has been appointed under the NEC4 Engineering and Construction Options, the available secondary options, schedules of cost components and contract data.

The NEC4 Engineering and Construction Subcontract uses clear and professional language, thus promoting fair dealing and greater certainty, as do all NEC4 Contracts.

Core Clauses
  • 1 General
  • 2 The Subcontractor’s main responsibilities
  • 3 Time
  • 4 Quality management
  • 5 Payment
  • 6 Compensation events
  • 7 Title
  • 8 Liabilities and insurance
  • 9 Termination
 
Main Option Clauses
  • Option A: Priced subcontract with activity schedule
  • Option B: Priced subcontract with bill of quantities
  • Option C: Target subcontract with activity schedule
  • Option D: Target subcontract with bill of quantities
  • Option E: Cost reimbursable subcontract
 
Resolving and Avoiding Disputes
  • Option W1
  • Option W2
 
Secondary Option Clauses
  • Option X1: Price adjustment for inflation (used only with Options A, B, C and D)
  • Option X2: Changes in the law
  • Option X3: Multiple currencies (used only with Options A and B)
  • Option X4: Ultimate holding company guarantee
  • Option X5: Sectional Completion
  • Option X6: Bonus for early Completion
  • Option X7: Delay damages
  • Option X8: Undertakings to the Client or Others
  • Option X9: Transfer of rights
  • Option X10: Information modelling
  • Option X11: Termination by the Contractor
  • Option X12: Multiparty collaboration (not used with Option X20)
  • Option X13: Performance bond
  • Option X14: Advanced payment to the Subcontractor
  • Option X15: The Subcontractor’s design
  • Option X16: Retention
  • Option X17: Low performance damages
  • Option X18: Limitation of liability
  • Option X20: Key Performance Indicators (not used with Option X12)
  • Option X21: Whole life cost
Note Option X19 is not used
  • Option Y(UK)1: Project Bank Account
  • Option Y(UK)2: The Housing Grants, Construction and Regeneration Act 1996
  • Option Y(UK)3: The Contracts (Rights of Third Parties) Act 1999
  • Option Z: Additional conditions of subcontract
 
  • Schedule of Cost Components
  • Short Schedule of Cost Components
  • Subcontract Data
  • Part one – Data provided by the Contractor
  • Part two – Data provided by the Subcontractor
  • Index
Product Information
ISBN 9780727762115
Publication Status Current
Publication Date 22/06/2017
Format (Paperback, Hardback etc) Paperback
Brand / Publisher NEC
Publisher ICE Publishing
Delivery

Upgrade to Next Day Delivery for Same Day Shipping up to 5pm

  • Delivery is within 3 working days* of your order being placed
  • Delivery is Monday to Friday, and Saturday (excluding Public Holidays)

Extra delivery charges are applied for international deliveries

Returns

Here is our returns information...

  • Returns from the UK are free and trackable
  • You have 28 days from the date your order was delivered or made available for collection to return it
100% Genuine Publications
  1. Free standard delivery
  2. Best price guaranteed
  3. Fast same-day shipping
  4. Over 20 years experience
  5. Family-run business